Texas · PWS TX0790028 · FORT BEND County

Quail Valley Utility District

What Quail Valley Utility District filed with TWDB about the water it produced and the water it billed for, 2015–2024 — and what the filing does and does not let anyone verify.

Non-revenue water, FY2024
13.3%
Computed from filed system input and billed consumption.
Recoverable annually
$40,997
As computed in the filed audit itself: apparent loss valued at this utility's own reported retail price of water, real loss at its own reported variable production cost. Not our estimate.
Balance check
closed
The filed water balance closes.

What the filing says

Quail Valley Utility District serves 4,803 retail connections and about 14,406 people. Because it reports more than 3,300 connections, it is on an annual water loss audit cycle with TWDB.

What the record shows

13.3% non-revenue water in FY2024, higher than 34% of the 908 Texas systems that filed that year.

The reported figure is stable, moving 4.8 points a year against a Texas median of 5.81, so the level is more likely to reflect the system than the paperwork.

Water balance, FY2024 · 436.6 MG system input
Billed 378.7 MG Unbilled authorized 5.67 MG Apparent loss 4.18 MG Real loss 48 MG Unexplained residual

Components sum to within 0.00% of reported system input, inside the 0.5% tolerance.

Filed history, 2015–2024
Year NRW Input (MG) Recoverable Balance
2024 13.3% 436.6 $40,997 closed
2023 12.5% 478.6 $44,428 closed
2022 11.3% 455.1 $39,578 closed
2021 21.0% 456.7 $32,296 closed
2020 10.3% 460.8 $26,736 closed
2019 16.9% 480.1 $44,753 closed
2018 10.3% 478.2 $27,190 closed
2017 12.0% 460 $31,194 closed
2016 7.3% 440.9 $20,272 closed
2015 8.6% 464.2 $23,430 closed

How to read the recoverable figure

Apparent loss is water that reached a customer and was never billed — under-registering meters, data-handling errors, unauthorized use. It is valued at the retail rate, because recovering it is revenue, and it is recoverable inside a budget year without capital work. Real loss is valued at variable production cost only: eliminating a leak saves what it cost to treat and pump the water, not what it would have sold for. Adding those two at the same rate is how a loss study produces a number nobody in a finance department believes.

As computed in the filed audit itself: apparent loss valued at this utility's own reported retail price of water, real loss at its own reported variable production cost. Not our estimate.

Comparable systems

Same county, or the same size band — 3,300–10,000 connections.

SystemBasis for comparisonNRW
Fort Bend County MUD 25FORT BEND County 18.9%
Sugar Land - GreatwoodFORT BEND County 7.2%
Fort Bend County MUD 23FORT BEND County 23.0%
Pecan Grove MUDFORT BEND County 10.0%
Sugar Land - New TerritoryFORT BEND County 15.8%
Fort Bend County MUD 142FORT BEND County 6.1%
Fort Bend County MUD 30FORT BEND County 8.4%
Fort Bend County MUD 58FORT BEND County 14.3%

Where is it going?

This page says how much — roughly $40,997 a year. It cannot say which accounts, which zones, or which meters. That takes your billing history, your meter reads, and your production data reconciled against each other.

Our Water Loss Recovery Snapshot is three weeks, one flat fee, and the deliverable is a ranked list of specific accounts and zones with dollars and a confidence on each.

See what the Snapshot delivers Email us about Quail Valley Utility District

Sources and corrections. Every figure above is either filed by the utility or computed from filed figures, and each one says which. If a number here is wrong, it is either wrong in the filing or wrong in our reading of it — tell us which and we will correct the page and say what changed.