Caddo Mills reported **29.4% non-revenue water** in FY2023, higher than 79% of the 785 Texas systems that filed that year. At the utility's own reported water rates that is **$206,927 a year**, as computed in the filed audit itself. The figure is trending worse across the record.

**The filed balance closes**, to within 0.00% of reported system input.

## Filed history

| Year | Non-revenue water % | System input (MG) | Cost of losses/yr | Balance |
|---|---|---|---|---|
| 2023 | 29.4% | 126.4 | $206,927 | closed |
| 2022 | 33.9% | 122.6 | $137,226 | closed |
| 2021 | 33.3% | 99.5 | $94,880 | closed |
| 2019 | 27.2% | 48.5 | $40,591 | closed |
| 2018 | 30.0% | 53.9 | $53,923 | closed |
| 2017 | 22.7% | 43.5 | $27,305 | closed |

`closed` means the filed components sum to the filed input. `failed` means they do not, by the stated residual.
`insufficient` means the check could not run because figures are missing — never to be read as a pass.

## How the cost figure is built

Apparent loss is water delivered and never billed, so it is valued at the retail rate: revenue, recoverable inside a
budget year without capital work. Real loss is valued at variable production cost, because eliminating a leak saves
treatment and pumping rather than retail price. Where the filed audit carries its own cost of losses — as TWDB's
export does — those figures are used directly and no rate of ours enters the calculation.

## Source

Texas Water Development Board — historical water loss audit data. Retrieved 2026-08-09. https://www.twdb.texas.gov/conservation/data/water-loss-dashboard.asp

Volumes are normalized to million gallons on ingest; the export reports them in the unit each filing states.